Booking parking lot paving during the winter gets your project measured, priced and approved before contractor calendars fill up in spring. It also leaves time to plan closures around tenants and customers instead of reacting to a crumbling lot in May.
For more than 45 years, the Troy, MI commercial asphalt team at American Asphalt has lined up lots like yours well before the first warm week.
Here's why the slow season is the right time to get next year's project on the books.
Michigan's Paving Window Is Short

Asphalt has to be placed hot and compacted before it cools. Minnesota's transportation department notes that air temperature and wind both drive the , so cold, windy days shrink the time crews have to do it right.
Supply follows the weather as well. A state inspection report describes one running from April or May to November, depending on weather and demand.
Spring Calendars Fill Early
When plants reopen, every property that put off work over the winter wants a date at the same time. Projects that are already scoped and signed can move onto the spring paving schedule first.
Lots that wait for the first pothole complaint usually end up behind them.
Budgets Get Approved in the Off-Season
If your company or ownership group sets next year's capital spending around the new year, a winter quote puts a real number in front of decision makers. That beats guessing and then asking for more money in June.
A realistic asphalt maintenance budget also shows whether paving, patching or sealcoating belongs in which year.
Scope Decisions Take Time
Before we lay any asphalt, our crew evaluates drainage, base conditions, traffic flow and ADA layout. Some of those findings add work, such as catch basin repair or regrading low spots.
Settling those choices in winter keeps the paving quote accurate and avoids change orders once crews arrive. Our guide on planning a commercial paving project covers the rest of the prep list.
Tenants Need Notice
Most commercial asphalt paving can be done with phased closures, so part of the lot stays open while another section is paved. Those phases work best when tenants, staff and delivery drivers know the dates weeks in advance.
Winter gives you time to pick low-traffic days and send notices. See how paving affects daily operations for more on keeping customers moving.
Striping and Finish Work Fit In Too
New asphalt needs new markings. Booking line striping with the paving keeps stalls, fire lanes and accessible spaces ready the day the lot reopens.
One contractor handling both also means one schedule to track instead of two.
Frequently Asked Questions
Can a parking lot be paved in a Michigan winter?
Full paving generally waits for spring because hot mix needs warm, dry conditions to compact properly, and many plants stop producing it in late fall. Winter is better spent on site visits, quotes and approvals.
Minnesota's transportation department explains that colder air and stronger wind make fresh asphalt lose heat faster, which shortens the time crews have to compact each layer.
What should I include when I request a paving quote?
Have the property address, the business name and the type of work in mind, such as new construction, remove and replace, resurfacing or milling. The American Asphalt quote form also has a space for details for the estimator.
Notes about drainage trouble spots, busy hours and phasing needs help the estimator price the job accurately the first time.
Who manages a commercial paving project from start to finish?
At American Asphalt Paving & Sealcoating, owners Mike and Chad Prandine personally manage each project from start to finish. That hands-on approach helps keep jobs on schedule and within budget.
The company is family-owned and fully insured, and it has served commercial properties around Troy, MI since 1979.
What types of properties does American Asphalt pave?
The company paves commercial lots for retail centers, office parks, industrial facilities, schools, churches, medical offices and apartment complexes. Each project gets the same evaluation of drainage, base and traffic flow before paving begins.
The crew can also handle the concrete work, striping and catch basins a project needs, so the whole lot is finished under one contract.
Will a winter quote change if the lot gets worse by spring?
It can, if freeze-thaw cycles open new potholes or widen cracks before your paving date. Water that seeps into cracks weakens the base, and a failed base may need repair before new asphalt goes down.
A quick walk-through before work starts confirms the scope, so any added repairs are agreed on before the crew arrives.
Get on Next Spring's Paving Schedule
The lots that get paved first each spring are the ones planned over the winter. Talk with our Troy, MI commercial paving contractors now about scope, phasing and timing for your property.
Call American Asphalt Paving & Sealcoating today at (248) 879-5900 or request a quote online.